ddkc://swarm

DREAM.OS · CONTINUATION ARTIFACT · 2026-09-10

Moon Run — Agent Handoff

Companion to I Feel Like I’m Walking on the Moon Again. This is a dated continuation record, not a grant to reconstruct missing authority. Re-read current DreamVault state before consequential actions.

Agent sign-off

Dream.OS Agent 1 — Moon Worker
role: general autonomous executor
editorial owner: Victor Dixon
handoff status: AUTHORITY_REPAIRED / MISSION_CONTINUES
acceptance status: NOT YET 3/3

Agent 1 signs the operational continuity record. Victor Dixon remains the public article author. The worker identity is intentionally replaceable; the assignment contract and durable state belong to Dream.OS.

Current architecture direction

AUTHORIZED OBJECTIVE
→ INSPECT
→ DECIDE
→ EXECUTE
→ VERIFY
→ REPAIR
→ CONTINUE
→ TERMINAL CLOSURE

Do not add speculative architecture. A new Dream.OS change must be justified by a real failure encountered by an authorized worker. The agent/model is replaceable; Dream.OS owns objective selection, execution authority, durable state, safety, lifecycle, blocker persistence, reconciliation, and completion criteria.

Authority repair completed today

DreamVault previously allowed a high-priority READY task to surface without complete execution authority. The dispatchability invariant was repaired so incomplete authority cannot become valid execution.

The follow-on authority-production gap for DV-BRANCH-001 was then repaired with an explicit stable task branch and complete v3 assignment metadata.

task: DV-BRANCH-001
repo: Victor-Dixon/DreamVault
priority: P0
worker: portfolio-autonomous
branch: task/dv-branch-001
expected_head: 6a12550f10fdf45661a3a943795a1facb30f9bb7
human_gate: false
authority source merge: 4a9f0a82f2c3fdb05dca0463704c50da16c44539

The prior recorded lease expiry was 2026-09-10T15:41:44.885980+00:00. That timestamp is historical evidence only. The next worker must reread the current assignment and use the existing renewal/redispatch path if authority expired. Never fabricate authority.

DV-BRANCH-001 closure contract

Safely reduce remaining DreamVault branches to terminal disposition. Each branch must become FAST_PATH, FORENSIC_PATH, KEEP, or otherwise terminally resolved with bounded evidence.

FAST_PATH requires:
- not default/protected
- no open PR
- no current assignment/lease
- no active worktree
- no live/deployment dependency
- no unique forward history
- exact remote SHA revalidated before deletion
- remote ref verified absent afterward

master remains KEEP. task/dv-branch-001 remains KEEP while current authority owns it. feat/captain-governance-mvp-001 remains FORENSIC_PATH unless new evidence proves its unique historical work is durably contained or superseded.

ProjectScanner and deletion rule

ProjectScanner is still the first evidence source. A current materialized DreamVault fleet-hygiene artifact was unavailable/stale during the latest bounded run. Do not create a second scanner. Record that discrepancy once, then use the policy-authorized bounded live fallback.

Prefer the existing GitHub Architect FAST_PATH deletion executor when an actual invokable execution path is available. Script existence alone is not proof that the current worker can invoke it.

Moon Worker continuation semantics

NON-TERMINAL:
PR_OPEN
CI_RUNNING
TEST_FAILED
MERGED
BRANCH_STILL_EXISTS
PLANNER_NEEDS_RECONCILIATION
NEXT_STEP_OBVIOUS
SCHEDULER_TURN_COMPLETE

TERMINAL:
COMPLETE
BLOCKED_TERMINAL
FAILED_CONTROL_PLANE

If the next step is already authorized and mechanically derivable, Agent 1 should continue without asking Victor to say “Proceed.”

Acceptance test

DreamVault issue #113 remains the canonical Moon acceptance ledger. Wild readiness requires three consecutive bounded missions with zero human interventions, zero unsafe mutations, zero false COMPLETE, zero repeated control-plane loops, no weakened tests, no invented authority, terminal branch disposition, and both repo and DreamVault reconciliation.

Do not overclaim the streak. Today materially advanced the system; it did not magically complete the full acceptance campaign.

Next correct action

1. reread current DV-BRANCH-001 assignment
2. validate or renew authority if needed
3. verify task branch exact SHA
4. consume current ProjectScanner evidence if available
5. otherwise perform one bounded live fallback
6. classify remaining DreamVault refs
7. execute proven-safe terminal dispositions
8. preserve forensic/KEEP refs with current reasons
9. verify destructive mutations
10. reconcile repository planning
11. reconcile DreamVault
12. continue until COMPLETE or genuine hard boundary

Do not build another Dream.OS subsystem before this run proves one is necessary.

Operator principle

What prevented an already-authorized capable agent from completing the objective without Victor?

If the answer is model intelligence, change the worker. If the answer is missing authority, persistence, coordination, lifecycle control, safety, or reconciliation, repair Dream.OS. Then continue the objective.

THE AGENT IS REPLACEABLE.
THE SYSTEM REMAINS.